About GBA
Our Sevices
What's new with us.
Our Clients
Employment at GBA
Contact Us
NAME:
Naval Submarine Base New London, Groton, CT
CLIENT:
Northern Division
N10 Industrial Highway
Mailstop No. 82
Lester, PA 19113-2090
COMPLETION DATE:
1996

PROJECT DESCRIPTION:
Navigational improvements, including deepening of existing channel and berthing areas, for Homeporting of SSN 21 “Seawolf" class submarines at Piers 32 and 33.

GBA SERVICES
Prepared cost estimates, plans, specifications, and bid documents

Analyzed channel configuration, performed hydrographic surveys, subsurface investigation, design analysis, and soil reports.

Field investigations included probing and boring to determine the extent and quantity of rock dredging.

The construction phase included before dredging surveys (for measurement and payment purposes), seven (7) before, during, and after placement as well as capping surveys at the New London disposal site.

AWARDS
During design phase received a Certificate of Appreciation for "extreme responsiveness and cooperative-ness in delivery of all contract services, and providing high quality technical product that is environmentally suitable”.


© 2008 Gahagan & Bryant Associates, Inc. All Rights Reserved.